At ActivoGrid we design the power infrastructure of your masterplan from Concept to Detailed Design stage. We can also design for Competitions being part of a wider utilities/infrastructure team.
Tasks and Deliverables
The tasks involved include:
- Develop energy strategy: onsite renewables generation.
- Estimate the energy demand based on energy density benchmarks
- Support coordination with local authorities
- Design power distribution infrastructure at Medium Voltage (MV).
- Design Public Realm distribution strategy at Low Voltage.
These tasks serve to produce the following deliverables:
- Energy Strategy and Infrastructure report (normally part of the Infrastructure>Utilities section).
- MV (11kV, 13.8 or 33kV) cables routing
- Primary Substations sizing and location
- Distribution Substations (MV/LV) sizing and location
- Load schedules to map supply chain for each building and justify estimated Maximum Demand Load at each element: Primary Substation – MV feeder – Distribution Substation – Plot – Building.
- Single Line Diagram detailing assets rating and protection, metering and control devices and networks.
- Phasing of power infrastructure according to development build-out programme.
The output from our design is used by the utilities and infrastructure designer to:
- Make the appropriate allowance of utility plots in consideration with power assets.
- Coordinate utilities rights-of-way.
- Select tie-in points to the site and for each plot/building.
- Coordinate location and area required at plot level for utility assets e.g. distribution substations.
- Run cost analysis and business plans
- Obtain approval from local authorities.
Key Points
ActivoGrid offers this services remotely.
ActivoGrid can undertake the design of power infrastructure in most of countries* if the necessary standards are available.
At our team we have extensive experience designing masterplan power infrastructure in the Kingdom of Saudi Arabia.
Example Projects
Note that the access to some of the project pages below might be password protected. This is because we are waiting from client’s content review and authorisation to make public the data provided here. Please, contact us for further information.